User Tools

Site Tools


wiki:econnect

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
wiki:econnect [2014/12/11 16:17] felipecwiki:econnect [2017/03/23 14:17] (current) apolderman
Line 1: Line 1:
-**Econnect**+=====Econnect=====
 {{ :wiki:econnect.png?200|}} {{ :wiki:econnect.png?200|}}
  
Line 7: Line 7:
   * Duration: 01/09/2008 - 30/11/2011   * Duration: 01/09/2008 - 30/11/2011
   * [[http://www.econnectproject.eu//|Project webpage]]   * [[http://www.econnectproject.eu//|Project webpage]]
-  * [[http://www.alpine-space.eu/projects/projects/detail/ECONNECT/show|Project on the website of the Alpine Space Programme]] +  * [[http://www.alpine-space.org/2007-2013/projects/projects/detail/ECONNECT/show/|Project on the website of the Alpine Space Programme]] 
  
  
Line 30: Line 30:
 === Project summary === === Project summary ===
 "ECONNECT aims at the enhancement of ecological connectivity in the Alpine Space. Protection of biodiversity and natural heritage – a central necessity to cope with the challenges of climate change – requires an integrated approach which beyond protected areas considers high biodiversity areas and corridors as linking elements of an Alpine ecological network. International umbrella organisations linked to the Alpine Convention, scientific institutions and local implementation partners have joined forces to demonstrate needs and options for action and develop innovative instruments for ecological connectivity. Pilot applications involving different stakeholders result in long-term implementation. To overcome legal and administrative constraints policy recommendations are presented ensuring effective cross-border cooperation and procedural harmonisation. Knowledge transfer and dissemination are guaranteed by the widely ramified structure of partners and the strategic use of networks." \\ "ECONNECT aims at the enhancement of ecological connectivity in the Alpine Space. Protection of biodiversity and natural heritage – a central necessity to cope with the challenges of climate change – requires an integrated approach which beyond protected areas considers high biodiversity areas and corridors as linking elements of an Alpine ecological network. International umbrella organisations linked to the Alpine Convention, scientific institutions and local implementation partners have joined forces to demonstrate needs and options for action and develop innovative instruments for ecological connectivity. Pilot applications involving different stakeholders result in long-term implementation. To overcome legal and administrative constraints policy recommendations are presented ensuring effective cross-border cooperation and procedural harmonisation. Knowledge transfer and dissemination are guaranteed by the widely ramified structure of partners and the strategic use of networks." \\
-Source: [[http://www.alpine-space.eu/projects/projects/detail/econnect/show/|Econnect project summary]]+Source: [[http://www.alpine-space.org/2007-2013/projects/projects/detail/ECONNECT/show/|Econnect project summary]]
  
 === Hypotheses === === Hypotheses ===
Line 56: Line 56:
 ^ Output^ Category^Language(s)^Target group^Remark            ^ ^ Output^ Category^Language(s)^Target group^Remark            ^
 |[[http://www.econnectproject.eu/cms/sites/default/files/EN_3.pdf|Webs of life. Alpine biodiversity needs ecological connectivity. Results from the ECONNECT project]]|[[Report]]| EN | Policy maker; civil servants / administration; Planner; Scientists; Specific institutions; Civil society / citizen |Final project document containing: The project in a nutshell, major achievements, connectivity and selected key species, pilot regions and implemented activities, policy recommendations, after Econnect: how to continue the process. [[In depth information on Results from the ECONNECT project]]| |[[http://www.econnectproject.eu/cms/sites/default/files/EN_3.pdf|Webs of life. Alpine biodiversity needs ecological connectivity. Results from the ECONNECT project]]|[[Report]]| EN | Policy maker; civil servants / administration; Planner; Scientists; Specific institutions; Civil society / citizen |Final project document containing: The project in a nutshell, major achievements, connectivity and selected key species, pilot regions and implemented activities, policy recommendations, after Econnect: how to continue the process. [[In depth information on Results from the ECONNECT project]]|
-|[[http://www.econnectproject.eu/cms/sites/default/files/Policy_Recommendation_printversion_en.pdf|Policy recommendations]]|[[(Policy) recommendations]]|EN | Policy makers | "[...] this document has the objective to inform policy makers and decision makers at all levels, from local to regional to trans-national, about key conclusions of the project. It is intended, among others, for government agencies and agencies at EU ministries. The purpose of the policy recommendations is to stimulate further development of and support for the ecological connectivity concept, as its implementation will result in enhanced effectiveness of programmes to conserve biodiversity both in cultural landscapes and in wilderness areas of the Alps, and the ecosystem services associated with it." [[http://www.econnectproject.eu/cms/sites/default/files/Policy_Recommendation_printversion_en.pdf|Policy recommendations]], p.1| +|[[http://www.econnectproject.eu/cms/sites/default/files/Policy_Recommendation_printversion_en.pdf|Policy recommendations]]|[[(Policy) recommendations]]|EN | Policy makers | "[...] this document has the objective to inform policy makers and decision makers at all levels, from local to regional to trans-national, about key conclusions of the project. It is intended, among others, for government agencies and agencies at EU ministries. The purpose of the policy recommendations is to stimulate further development of and support for the ecological connectivity concept, as its implementation will result in enhanced effectiveness of programmes to conserve biodiversity both in cultural landscapes and in wilderness areas of the Alps, and the ecosystem services associated with it." [[http://www.econnectproject.eu/cms/sites/default/files/Policy_Recommendation_printversion_en.pdf|Policy recommendations]], p.1 [[In depth information on Policy Recommendations]]
-|[[http://www.econnectproject.eu/cms/sites/default/files/implementation_%20recommendation_printversion_en.pdf|Implementation recommendations]]|[[Guidelines]]|EN|civil servants / administration; Planner; Specific institutions| "During implementation of the ECONNECT project, seven pilot regions under the leadership of protected area administrations applied a common methodology to elaborate and realize various concrete measures and to establish spatial linkages in order to improve ecological connectivity in their region. The experiences and lessons learnt from this process are summarized in the ‘Implementation Recommendations’. The Implementation Recommendations are aimed at supporting protected area administrations and experts working towards nature conservation at a regional level." [[http://www.econnectproject.eu/cms/sites/default/files/implementation_%20recommendation_printversion_en.pdf|Implementation recommendations]], p.1| +|[[http://www.econnectproject.eu/cms/sites/default/files/implementation_%20recommendation_printversion_en.pdf|Implementation recommendations]]|[[Guidelines]]|EN|civil servants / administration; Planner; Specific institutions| "During implementation of the ECONNECT project, seven pilot regions under the leadership of protected area administrations applied a common methodology to elaborate and realize various concrete measures and to establish spatial linkages in order to improve ecological connectivity in their region. The experiences and lessons learnt from this process are summarized in the ‘Implementation Recommendations’. The Implementation Recommendations are aimed at supporting protected area administrations and experts working towards nature conservation at a regional level." [[http://www.econnectproject.eu/cms/sites/default/files/implementation_%20recommendation_printversion_en.pdf|Implementation recommendations]], p.1 [[In depth information on Implementation Reccomendations]]
-|[[http://www.econnectproject.eu/cms/sites/default/files/WP6%20executive%20summary.pdf|The ECONNECT Project and the Work Package 6]]|[[Executive summary / policy oriented summary]]|EN|Policy maker; civil servants / administration; Planner; Scientists; Specific institutions; Civil society / citizen| Study on legal barriers.| +|[[http://www.econnectproject.eu/cms/sites/default/files/WP6%20executive%20summary.pdf|The ECONNECT Project and the Work Package 6]]|[[Executive summary / policy oriented summary]]|EN|Policy maker; civil servants / administration; Planner; Scientists; Specific institutions; Civil society / citizen| Study on legal barriers. [[In depth information on Study on legal barriers ]]
-|[[http://gis.nationalpark.ch/arcgisserver_app/secure/econ_jecami.htm|Joint Ecological Continuum Analysing and Mapping Initiative (JECAMI) – Webservices]]|[[tool]]|EN|Policy maker; civil servants / administration; Planner; Scientists; Specific institutions; Civil society / citizen| "The JECAMI-Webservice (Joint Ecological Continuum Analysing and Mapping Initiative – Webservices) is composed of the CSI-Service (Continuum-Suitability-Index), the SMA-Service (Species Mapping Application) and the PAM-Service (Priority Areas Mapping)." [[http://gis.nationalpark.ch/arcgisserver_app/secure/econ_jecami.htm|Joint Ecological Continuum Analysing and Mapping Initiative (JECAMI) – Webservices]]| +|[[http://gis.nationalpark.ch/arcgisserver_app/secure/econ_jecami.htm|Joint Ecological Continuum Analysing and Mapping Initiative (JECAMI) – Webservices]]|[[tool]]|EN|Policy maker; civil servants / administration; Planner; Scientists; Specific institutions; Civil society / citizen| "The JECAMI-Webservice (Joint Ecological Continuum Analysing and Mapping Initiative – Webservices) is composed of the CSI-Service (Continuum-Suitability-Index), the SMA-Service (Species Mapping Application) and the PAM-Service (Priority Areas Mapping)." [[http://gis.nationalpark.ch/arcgisserver_app/secure/econ_jecami.htm|Joint Ecological Continuum Analysing and Mapping Initiative (JECAMI) – Webservices]] [[In depth information on JECAMI]]| 
-|[[http://blog.zhdk.ch/ecogame/|Ecogame]]|[[Public relation]]|DE|Civil Society / citizen| A game on ecological topics developed within the sphere of the ECONNECT project.| +|[[http://blog.zhdk.ch/ecogame/|Ecogame]]|[[Public relation]]|DE|Civil Society / citizen| A game on ecological topics developed within the sphere of the ECONNECT project. [[In depth information on ECOGAME]]
-|[[http://www.alpine-space.eu/uploads/tx_txrunningprojects/ECONNECT_PilotAreas_Overview.pdf.zip|ECONNECT Pilot Areas]]|[[Map]]|EN|Policy maker; civil servants / administration; Planner; Scientists; Specific institutions; Civil society / citizen|Map showing the location of the seven project pilot Areas.| +|[[http://www.alpine-space.org/2007-2013/uploads/tx_txrunningprojects/ECONNECT_PilotAreas_Overview.pdf.zip|ECONNECT Pilot Areas]]|[[Map]]|EN|Policy maker; civil servants / administration; Planner; Scientists; Specific institutions; Civil society / citizen|Map showing the location of the seven project pilot Areas. [[In depth information on Pilot Areas]]
-|[[http://www.econnectproject.eu/cms/sites/default/files/BibliographieFranceReseauxEcologiques_0.pdf|Bibliographie indicative «Réseaux écologiques en France»]]|[[Literature review]]|FR|Policy maker; civil servants / administration; Planner; Scientists; Specific institutions;| Literature overview on ecological networks in France.|+|[[http://www.alpine-space.org/2007-2013/uploads/tx_txrunningprojects/Bibliographie_France_Reseaux_Ecologiques.pdf|Bibliographie indicative «Réseaux écologiques en France»]]|[[Literature review]]|FR|Policy maker; civil servants / administration; Planner; Scientists; Specific institutions;| Literature overview on ecological networks in France. [[In depth information on Bibliography review]]| 
 + 
  
  
-==Outcomes and Impacts== 
-Unlike project outputs, outcomes and results cannot be described in a standardised way. Therefore, they are listed as free text:\\  
  
 ==Résumé of project outputs== ==Résumé of project outputs==
Line 111: Line 110:
 === Accessibility of project results === === Accessibility of project results ===
   * [[http://www.econnectproject.eu/cms/?q=download_area/en|Econnect outputs on the official website of the project]]    * [[http://www.econnectproject.eu/cms/?q=download_area/en|Econnect outputs on the official website of the project]] 
-  * [[http://www.alpine-space.eu/projects/projects/detail/ECONNECT/show|Econnect outputs on the website of the Alpine Space Programme]]  +  * [[http://www.alpine-space.org/2007-2013/projects/projects/detail/ECONNECT/show/|Econnect outputs on the website of the Alpine Space Programme]] 
- +
-{{tag>"legislation" "natural heritage" "environmental policy" "knowledge transfer" "biodiversity"}}+
  
 === Synergies === === Synergies ===
Line 122: Line 119:
   * [[wiki:synergies_reducing_environmental_damage_and_natural_hazard_risk_prevention|Reducing environmental damage and natural hazard risk prevention]]   * [[wiki:synergies_reducing_environmental_damage_and_natural_hazard_risk_prevention|Reducing environmental damage and natural hazard risk prevention]]
  
 +{{tag>"legislation" "natural heritage" "environmental policy" "knowledge transfer" "biodiversity" "EU project"}}
wiki/econnect.1418311075.txt.gz · Last modified: 2014/12/11 16:17 by felipec