User Tools

Site Tools


wiki:greenalps

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
wiki:greenalps [2014/06/20 10:49] carolinepwiki:greenalps [2017/03/23 14:19] (current) apolderman
Line 1: Line 1:
-**GreenAlps** {{ :wiki:logo_ga.png?200|}}+=====greenAlps=====  
 +{{ :wiki:logo_ga.png?200|}}
  
 +//Valorizing connectivity and sustainable use of resources for successful ecosystem management policies in the Alps//
  
   * AS priority area: Accessibility and Connectivity   * AS priority area: Accessibility and Connectivity
 +  * Duration: 01/09/2013 - 30/11/2014
   * [[http://www.greenalps-project.eu/|Project webpage]]   * [[http://www.greenalps-project.eu/|Project webpage]]
 +  * [[http://www.alpine-space.org/2007-2013/projects/projects/detail/GreenAlps/show/|Project on the website of the Alpine Space Programme]] 
  
 === Project Partners === === Project Partners ===
-  * **Lead partner**: [[http://www.alparc.org/|The Alpine Network of Protected Areas (Alparc)]]  +  * **Lead partner**: [[http://www.alparc.org/|The Alpine Network of Protected Areas (Alparc)]] **Contact Person:**Dr. Yann Kohler, Tel.: +33 4 79 26 55 00, yann.kohler[at]alparc.org 
-  * [[http://www.vetmeduni.ac.at/en/research-institute-of-wildlife-ecology/|University of Veterinary Medicine Vienna; Research Institute of Wildlife Ecology]] (AT) +  * [[http://www.vetmeduni.ac.at/en/research-institute-of-wildlife-ecology/|University of Veterinary Medicine Vienna; Research Institute of Wildlife Ecology]] (AT) **Contact Person:** Chris Walzer, Tel.: +43 1 489091 5180, chris.walzer[at]fiwi.at 
-  * [[http://www.eurac.edu|European Academy of Bozen/Bolzano]] (IT) +  * [[http://www.eurac.edu|European Academy of Bozen/Bolzano]] (IT) **Contact Person:** Filippo Favilli, Tel.: +39 0471 055 327, filippo.favilli[at]eurac.edu 
-  * [[http://www.nationalpark-berchtesgaden.bayern.de|Berchtesgaden Nationalpark Administration]] (DE) +  * [[http://www.nationalpark-berchtesgaden.bayern.de|Berchtesgaden Nationalpark Administration]] (DE) **Contact Person:** Michaela Künzl, Tel.: +49 8652 9686-135, michaela.kuenzl[at]npv-bgd.bayern.de 
-  * [[http://www.kalkalpen.at/system/web/default.aspx?sprache=2|National Park Upper Austrian Lime Stone Alps]] (AT) +  * [[http://www.kalkalpen.at/system/web/default.aspx?sprache=2|National Park Upper Austrian Lime Stone Alps]] (AT) **Contact Person:** Mag. Christoph Nitsch, Tel.: +43 7584 3951-234, christoph.nitsch[at]kalkalpen.at 
-  * [[http://www.bohinj.si/en|Tourism Bohinj, local tourist board]](SL) +  * [[http://www.bohinj.si/en|Tourism Bohinj, local tourist board]](SL) **Contact Person:** Vida Kovacic, Tel.: +386 4574 75 90, v.kovacic[at]bohinj.si 
-  * [[http://www.parcoprealpigiulie.it/|Julian Prealps nature regional Park]](IT) +  * [[http://www.parcoprealpigiulie.it/|Julian Prealps nature regional Park]](IT) **Contact Person:** Stefano Santi, Tel.: +39 320 421 4627, stefano.santi[at]parcoprealpigiulie.it 
-  * [[http://www.cipra.org/en|International Commission for the Protection of the Alps]] (FL)+  * [[http://www.cipra.org/en|International Commission for the Protection of the Alps CIPRA]] (LI**Contact Person:** Aurelia Ullrich-Schneider, Tel.: +423 237 53 08, aurelia.ullrich[at]cipra.org
  
 === Project summary === === Project summary ===
  
-"GreenALPS shapes the framework for a sustainable and efficient European nature and biodiversity conservation policy for the Alps. It relies on two key projects covering essential issues how to best conserve alpine biodiversity (ECONNECT) and how to deal with the huge demand for renewable energy related impacts on nature (recharge.green). Both projects are linked and deliver(ed) essential outcomes for the future management of alpine natural assets. Nevertheless results are still too sectoral and need further efforts to reach additional key stakeholders & policy makers. A significant reduction of fragmentation of Alpine natural or semi-natural habitats is needed, calling a long-term orientated land use planning, new ways of cooperation and a precautionary approach of other key sectors The successful governance approach of pilot regions beyond protected areas will be reviewed and disseminated at the same time by capitalizing on already ongoing participatory processes in old and new PR."(Source:http://www.alpine-space.eu/projects/projects/detail/GreenAlps/show/)+"greenAlps shapes the framework for a sustainable and efficient European nature and biodiversity conservation policy for the Alps. It relies on two key projects covering essential issues how to best conserve alpine biodiversity (ECONNECT) and how to deal with the huge demand for renewable energy related impacts on nature (recharge.green). Both projects are linked and deliver(ed) essential outcomes for the future management of alpine natural assets. Nevertheless results are still too sectoral and need further efforts to reach additional key stakeholders & policy makers. A significant reduction of fragmentation of Alpine natural or semi-natural habitats is needed, calling a long-term orientated land use planning, new ways of cooperation and a precautionary approach of other key sectors The successful governance approach of pilot regions beyond protected areas will be reviewed and disseminated at the same time by capitalizing on already ongoing participatory processes in old and new PR."(Source:http://www.alpine-space.org/2007-2013/projects/projects/detail/GreenAlps/show/)
  
 === Hypotheses === === Hypotheses ===
Line 31: Line 35:
 === Topics === === Topics ===
   * [[Reducing environmental damage]]   * [[Reducing environmental damage]]
-  * [[Access to information and knowledge]]+  * [[Developing access to information and knowledge]]
   * [[Safe development of energy resources]]   * [[Safe development of energy resources]]
   * [[Enhancing and protecting natural resources and heritage]]   * [[Enhancing and protecting natural resources and heritage]]
  
 ===Results=== ===Results===
-Results of a project can be differentiated in [[#outputs|outputs]], [[#outcomes and impacts|outcomes and impacts]] of an intervention.[[http://www.oecd.org/dataoecd/40/7/43184177.pdf|OECD Glossary of Key Terms in Evaluation and Results Based Management]]+[[Results]] of a project can be differentiated in [[wiki:results#outputs|outputs]], [[wiki:results#outcomes and impacts|outcomes and impacts]] of an intervention. Source:[[http://www.oecd.org/dataoecd/40/7/43184177.pdf|OECD Glossary of Key Terms in Evaluation and Results Based Management]].
-Project outputs can generally be identified very easily. Yet, they represent only a first step towards the ultimate objective of project interventions: Initiating project-related outcomes and having true impacts on the ground.+
  
 ==Outputs== ==Outputs==
-Outputs are an immediate deliverable of a project, which result from a development intervention. They should be finalised and publicly available by the time the project terminates. Outputs comprise tangible project results such as tools, databases, executive summaries, educational material etc.+
 ^ Output^ Category^Language(s)^Target group^Remark            ^ ^ Output^ Category^Language(s)^Target group^Remark            ^
 +|[[http://www.greenalps-project.eu/wp-content/uploads/2013/10/greenAlps-Final-Booklet.pdf| Final booklet: Connecting mountains, people, nature – Shaping the framework for an efficient European biodiversity policy for the Alps]] |n.a.|  EN      |n.a. |n.a.|
 +|[[http://www.greenalps-project.eu/wp-content/uploads/2013/10/greenAlps-Policy-Recommendations-EN.pdf| Staking a claim for nature – Policy recommendations for the Alpine Space]]|n.a.|  EN, FR, IT, DE, SI      |decision makers |n.a.|
 +|[[http://www.greenalps-project.eu/wp-content/uploads/2013/10/greenAlps-PolicyLandscape.pdf| The EU Biodiversity Policy Landscape. Existing policies and their perceived relevance and impact in key sectors in the alpine region]] |n.a.|  EN      |n.a. |n.a.|
 +|[[http://www.greenalps-project.eu/wp-content/uploads/2013/10/greenAlps-Stakeholder-networks.pdf| Biodiversity Stakeholder Networks in the Alpine Space]] |n.a.|  EN      |n.a. |n.a.| 
 +|[[http://www.alpine-space.org/2007-2013/uploads/tx_txrunningprojects/4_WP5_5.1_Biodiv_CommonStrategicFramework.pdf| Common Strategic Framework(CSF) 2014-2020 & Biodiversity]]|n.a.|  EN      |n.a. |n.a.|
 +|[[http://www.greenalps-project.eu/wp-content/uploads/2013/10/greenAlps-Recommendations-ASP.pdf| Ten recommendations to the Alpine Space Programme]] |n.a.|  EN      |n.a. |n.a.|  
 |[[http://www.greenalps-project.eu/first-results/| Discussion on first results]]|[[other]]| EN        | Policy makers, civil servants / administration / planner / scientists / specific institutions|The first results of the activities that started in September 2013, have been the object of a meeting among the project partners that took place in Vienna in early December.In particular, the partners focused on the database gathering the main results of other international projects so as to maximize them and on an investigation on the most important European policies concerning biodiversity and ecosystem services, which is already available.| |[[http://www.greenalps-project.eu/first-results/| Discussion on first results]]|[[other]]| EN        | Policy makers, civil servants / administration / planner / scientists / specific institutions|The first results of the activities that started in September 2013, have been the object of a meeting among the project partners that took place in Vienna in early December.In particular, the partners focused on the database gathering the main results of other international projects so as to maximize them and on an investigation on the most important European policies concerning biodiversity and ecosystem services, which is already available.|
  
  
 ==Outcomes and Impacts== ==Outcomes and Impacts==
-Outcomes are the likely or achieved short-term and medium-term effects of an intervention's outputs, e.g. the outcome of improved, knowledged-based decision-making processes as an effect of a knowledge database (= output) established by a project. Outcomes will in most cases not materialise before project closure. +Unlike project outputs, outcomes and results cannot be described in a standardised way. Therefore, they are listed as free text:\\  
-\\ Impacts are positive and negative, primary and secondary long-term effects produced by a development intervention, directly or indirectly, intended or unintended.[[http://www.oecd.org/dataoecd/40/7/43184177.pdf|OECD Glossary of Key Terms in Evaluation and Results Based Management]] +//<to be filled in>//
-\\ As outcomes and impacts are difficult to differentiate, this section contains both of these types of project results.  +
-\\ The identification of outcomes and impacts requires a deeper insight into the respective project e.g. through project participants or direct interviews with project representatives. Outcomes and impacts are usually not solely influenced by projects, but are a complex combination of project results on the one hand and framework conditions on the other. Unlike project outputs, outcomes and results cannot be described in a standardised way. Therefore, they are listed as free text:\\  +
-<to be filled in>+
  
  
 === Accessibility of project results === === Accessibility of project results ===
   * [[http://www.greenalps-project.eu/download/|greenAlps outputs on the official website of the project]]    * [[http://www.greenalps-project.eu/download/|greenAlps outputs on the official website of the project]] 
-  * [[http://www.alpine-space.eu/projects/projects/detail/GreenAlps/show/|greenAlps outputs on the Website of the Alpine Space Programme]] +  * [[http://www.alpine-space.org/2007-2013/projects/projects/detail/GreenAlps/show/|greenAlps outputs on the website of the Alpine Space Programme]]  
 + 
 +{{tag>"natural resource management" "biodiversity" "connectivity" "knowledge transfer" "EU project"}}
wiki/greenalps.1403254151.txt.gz · Last modified: 2014/06/20 10:49 by carolinep