wiki:participatory_planning_and_gis
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Last revisionBoth sides next revision | ||
wiki:participatory_planning_and_gis [2017/12/19 14:57] – apolderman | wiki:participatory_planning_and_gis [2017/12/19 15:04] – apolderman | ||
---|---|---|---|
Line 5: | Line 5: | ||
* urban and rural development, | * urban and rural development, | ||
* [[: | * [[: | ||
- | * conflicting objectives (e.g. energy production and transmission, | + | * conflicting objectives (e.g. energy production and transmission, |
A participatory approach to spatial planning, thus including multiple actors such as civil society | A participatory approach to spatial planning, thus including multiple actors such as civil society | ||
Line 11: | Line 11: | ||
=== Advantages of Participatory Spatial Planning === | === Advantages of Participatory Spatial Planning === | ||
- | * More democratic planning process | + | * More democratic planning process, |
- | * More transparent government | + | * More transparent government, |
- | * Increased sense of responsibility and ownership by local actors | + | * Increased sense of responsibility and ownership by local actors, |
- | * Increased efficiency: consulting with local actors about their needs and concerns. | + | * Increased efficiency: consulting with local actors about their needs and concerns, |
- | * Raising the citizens’ awareness and responsibility for their local community | + | * Raising the citizens’ awareness and responsibility for their local community, |
- | * Providing training and experience in participatory democracy | + | * Providing training and experience in participatory democracy, |
- | * Generating policies and measures that the citizens themselves request (CEMAT 2012)((https:// | + | * Generating policies and measures that the citizens themselves request (CEMAT 2012)((https:// |
=== Challenges of Participatory Spatial Planning === | === Challenges of Participatory Spatial Planning === | ||
Line 23: | Line 23: | ||
* Adding multiple stakeholders to the planning process means an extra challenge to an already difficult and complex process. | * Adding multiple stakeholders to the planning process means an extra challenge to an already difficult and complex process. | ||
* Not all stakeholders equitably represented in planning process | * Not all stakeholders equitably represented in planning process | ||
- | * Unrealistic expectations of stakeholders ((https:// | + | * Unrealistic expectations of stakeholders |
=== Participatory Planning and GIS === | === Participatory Planning and GIS === | ||
- | The field of spatial planning has become more and more intertwined with [[: | + | The field of spatial planning has become more and more intertwined with [[: |
=== PGIS and Ecosystem Services === | === PGIS and Ecosystem Services === | ||
- | GIS in general is an important tool in the mapping and assessment of [[: | + | GIS in general is an important tool in the mapping and assessment of [[: |
=== AlpES Project === | === AlpES Project === | ||
- | In the [[: | + | In the [[: |
wiki/participatory_planning_and_gis.txt · Last modified: 2017/12/19 15:06 by apolderman